Bid Phase
- Front End Engineering
- Hull repair and Conversion Specification Development
Construction Phase
- Structural Topsides Fabrication Supervision
- Detailed Engineering (on site)
- Integration Management
- Commissioning Management
- Vendor/design interfacing
|
Bid Phase
- Procurement Specifications Development (mechanical systems and hull outfitting)
- Cost database Development
Construction Phase
- Supply Chain Management
- Site DCC
- Tagging Systems Management
- Subcontractor Management
|
Bid Phase
Construction Phase
- Engineering Manager
- 8-man Construction / Commissioning Team
|
Bid Phase
- Concept Development for Design / Detailed Design
- Mooring System Evaluation
- Bid Development
- Shipyard ITT
- Procedures Development Cost estimates
MODEC was eventually successful in Bid and Proceanic continued to support MODEC throughout engineering, construction and commissioning.
Construction Phase
EPC Contractor Representative:
- Bid Assessment
- Contract Negotiation
- Award of Classification Contract (ABS)
- Thickness measurements & equipment packages
|